|
1. Pack base of mould with required grade of rubber.
2. Insert pattern, having inserted core of different grade rubber if required.
3. Pack top of mould with required grade of rubber.
4. Vulcanise for 15 minutes per 10 mm of mould thickness at 80 oC.
5. Cut mould..
6. Mould is ready to use. |